Scope
IC Integrity successfully restored a corroded crane cab aboard an FPSO in Western Australia that had been experiencing water ingress.
Our engineered composite repair solution delivered a 20-year design life, sealing the leak, preventing further ingress, and providing structural reinforcement to support loads on top of the cab.
Solution
The Technowrap™ repair used our SRS carbon fibre cloth and DRS resin (Deck Rehabilitation System), and was completed seamlessly by our experienced technicians, supported by the client’s onboard trained personnel – all with minimal impact on operations.
Results
A cost-effective and quick project, this Technowrap™ scope was completed with maximum efficiency and minimal disruption for our client.
Interested in using composite repairs in Australia? You can find out more about our services, or contact a member of our team, by clicking here.




