Date | Client | Location |
---|---|---|
April 2022 | EDF | North West England |
Scope
Various repairs carried out on a Carbon Steel Demin Water Reserve Feed Tank. The tank was suffering from through-wall defects due to external corrosion.
Solution
ICR were requested to provide an engineered repair solution to restore the integrity of the tank for a design life of 20 years.
Results & Benefits
- ICR provided engineering design calculation complete with design sketch, materials and manpower to complete the 8-layer repair using Technowrap™ 2K HA
- 5 x Dayshifts, 5 x repairs
- Fast & cost effective versus replacement