Quickflange™ Process Water System Replacement – UK Nuclear Facility

Challenges

  • Large-scale pipe replacement with no hot work permitted

Benefits

  • Rapid system reinstatement with reduced outage and safety risk

Scope

As part of a planned maintenance campaign at a nuclear facility, 32 off 6” Schedule 10, Class 150 pipe connections within the process water system required replacement.

Due to the operational environment, limited outage window, and strict safety controls associated with hot work, welding was neither practical nor permitted within the available timeframe. The client required a safe and efficient alternative to complete the work and reinstate the system.

Solution

Quickflange™ provided an effective cold-work solution, enabling reinstatement of the process water system within the limited outage window while minimising disruption to this safety-critical operation.

ICR personnel and equipment were mobilised to site, where the required Quickflange™ connectors and replacement pipework were successfully installed. Following completion, all connections were pressure tested to verify joint integrity and ensure compliance with client and industry standards.

Results

  • The project was completed successfully, allowing safe and efficient reinstatement of the process water system.
  • Extensive permitting requirements, safety controls, and operational restrictions associated with welding were avoided.
  • Significant schedule savings were achieved, reducing outage duration and operational risk.

Contact ICR Today

To explore our services for the nuclear sector further, or to make an enquiry with our team, please click here.