Challenges
- Internal erosion with significant wall loss
Benefits
- Rapid local repair supported by ICR engineering expertise
Scope
ICR’s South African partner, Rhokana, was engaged to repair a 30” T-section at a South African refinery carrying cooling water containing multiple trace elements. The carbon steel component was operating at 2 bar and 40°C and had suffered internal erosion, with a remaining wall thickness of 3.37 mm.
ICR provided engineering and technical support, developing a repair designed to withstand the full applied load and modelled against a circular 25 mm through-wall defect.
Solution
Rhokana completed the repair using eight layers of Technowrap™ 2K and high ambient resin. The composite repair was installed and completed within 10 hours before being allowed to fully cure.
Results
- Internal erosion successfully reinforced
- Full applied loads accommodated by the repair
- Repair completed within 10 hours
- System returned to service following full cure
- Local repair delivery supported by ICR engineering expertise

Contact ICR Today
Featured articles
9 September | 2026
Technowrap™ Awarded Bureau Veritas (BV) Type Approval
26 August | 2026
ICR Completes Major Composite Repair Project in the Marine Sector
1 July | 2026