Engineered Composite Repairs
Technowrap™ 2K - 10” LP Hydrocarbon Gas Line
Widespread external corrosion and through-wall defects were found along approx. 30m of a 10” hydrocarbon gas line.
View Case Study
Technowrap™ 2K 14” Drain Line From Helideck
CLIENT: MAJOR NORTH SEA OPERATOR | LOCATION: NORWAY NORTH SEA
View Case Study
Technowrap™ 2K HA - 30” Crude Oil Leaking Clamp
DATE: APRIL 2018 | LOCATION: ABDALI MAIN POINT – ABDAIL MID POINT, KUWAIT
View Case Study
Technowrap™ SRS Stair Tower Repair
The stair tower on large North Sea platform was out of use due to heavy corrosion on the structural members. T
View Case Study
Technowrap™ 2K HA - 36inch Above Ground Pipeline Header Repair
A 36” pipeline header system had significant internal erosion/corrosion at the 6 o’clock position with a minimum remaining wall thickness of 3mm.
View Case Study
TECHNOWRAP™ 2K HA - 20” FLARE LINE LEAKING ELBOW
A 20” Flare Gas line had suffered a through-wall defect due to substantial internal corrosion.
View Case Study
Structural Repair Iraq - 20” Gas Flare Line Repair
ICR were requested to repair a 20” Gas Flare Line in Iraq which was suffering from external wall thinning.
View Case Study
Technowrap™ 2K Potable Water 24” CS Pipe with Clamp Online Repair
A 24” Carbon Steel pipe was suffering from weld failure due to internal corrosion issues which caused a leak.
View Case Study
Technowrap™ 2K HT - 14” 16” Hydrocarbon Line
CLIENT: MAJOR MALAYSIAN REFINERY | DATE: 2013 | LOCATION: MALAYSIA
View Case Study
Technowrap™ E1 - 36” Carbon Steel Thrust Boring
Over 900 metres of 36” Carbon Steel line was to be used for Thrust Boring & the client required a repair that protected the pipeline from any external damage when the procedure took place.
View Case Study
TECHNOWRAP™ 2K HA URGENT CONCENTRIC REDUCER REPAIR
A concentric reducer onboard a supermajor operator’s asset in the GOM had developed a through wall pin hole leak in need of urgent and immediate repair.
View Case Study
TECHNOWRAP™ SRS VESSEL HELIDECK FIRE MAIN SYSTEM
A well-known subsea installation contractor contacted ICR to discuss some issues with the helideck firemain on one of their vessels.
View Case Study
Technowrap™ DRS - Main Deck Repair
ICR, along with local partner H.J. Stauble, were tasked with providing a cold work solution, due to the platform being online, to refurbish a main deck which had multiple areas of corrosion.
View Case Study
Structural Repair - Stair Tower I-beam and Tubular Supports
The underside of a deck stair tower onboard a North Sea platform had developed severe corrosion and wall thinning on the stanchion tubular supports, with large, localised perforations on the beam web and flanges
View Case Study
Technowrap™ 2K Potable Water - 10” Carbon Steel Pipe Two Clamp Online Repair
A 10” carbon steel pipe was suffering from internal corrosion and subsequently a welds failure which caused leaks in two different areas.
View Case Study
Technowrap 2K H.T.™ High Temperature & High Pressure Cracked Gas Dryers - Online Repair
16 locations - tapping lines and headers - distributed on two Hydrocarbon cracked Carbon Steel gas dryers, were suffering from severe wall thickness loss due to corrosion.
View Case Study
Technowrap™ 2K Potable Water Tank Nozzle
A technician on-board an operator’s asset in the GOM performed a profile radiography test on a leaking nozzle outlet attached to a potable water tank.
View Case Study
Technowrap™ SRS Galley Laydown Tubular Supports
The client identified some areas of external corrosion on the steel tubular support beams at the Galley Laydown platform.
View Case Study
TECHNOWRAP™ 2K HA HEATED SEPARATOR VESSELS
ICR were requested to provide an engineered composite repair to reinstate the integrity of two pressure vessels that were both experiencing localised pitting and wall loss.
View Case Study
Structural Repair - Vibration Induced Fatigue Failure
An investigation on board a north sea platform was carried out on a 6” super duplex line that was suffering from vibration.
View Case Study
Technowrap™ DRS - Cellar Deck DRS Repair
Our client contacted us to inform us of their concerns with corrosion on a carbon steel cellar deck area covering 26 square metres in total.
View Case Study
Technowrap™ 2K Potable Water 2” CS Tee With Clamp - Online Repair
A 2” carbon steel Tee pipe was suffering from internal corrosion and subsequently a weld failure which caused a leak.
View Case Study